Unmasked the engine case halves. The paint needs to "cure" at 200f for 1 hour to achive max durability and chemical resistance. This was done in the oven. Our oven has a convection feature which also runs an exhaust fan to the outside. Any offgassing is vented outside.
Sorted and bagged the engine components according to the build sequence in the assembly manual. This allowed me to determine if I had all the bits and pieces I needed for each step.
I will need to buy or build (2) 1/4 IDx3/8L and (4) 1/4 IDx3/4 L standoffs for the regulator and coil attachments to the firewall.